🏛️ Meeting Room & Special Space Configuration
EDITABLE PER PROJECT
Standard rooms are pre-loaded. Add, edit or remove any room type for this specific client. All changes reflect instantly in the output.
Quick-add presets ↓
Room / Space Name
Seats
No. of Rooms
AV Equipped
Mode
Type
Action
Space Programme · IWPS Global
—
—
—
—
—
—
—
—
At a Glance
—
Workstations
—
Meeting Rooms
—
Alt. Seats
—
WC Fixtures
—
Tonnes HVAC
—
Light Fixtures
—
AV Units
—
EHU Units
01 — Occupancy & Workstations
👥
Occupancy Logic
Total Headcount—
Design Model—
Peak Design Population—
Female / Male—
💼
Workstations
—/floor
Usable Area—
Sq Ft per Workstation—
Workstations Required—
🛋️
Alternate Seating
—/floor
Collab Zones (15%)—
Informal Meeting (10%)—
Lounge Seating (8%)—
Work Café Seats (25%)—
Total Alt. Seats—
02 — Meeting Room & Special Space Inventory
🏛️
Full Room Programme
—/floor
Room / Space
Rooms
Seats Each
Total Seats
Per Floor
AV
Mode
Total Rooms · Total Seats—
03 — Washrooms & MEP
🚻
Washrooms — NBC India
—/floor
Female Staff (design pop.)—
Female WCs (1 per 25F)—
Male Staff (design pop.)—
Male WCs (1 per 50M)—
Urinals (1 per 25M)—
Washbasins/HU (1 per 15)—
Accessible Units (1/floor)—
Total Fixtures—
❄️
HVAC — Tonnage & EHU
Selected City—
Climate Zone—
Load Factor (TR/sq ft)—
Total Tonnage—
Tonnage per Floor—
EHU Units (1/600 sq ft)—
EHU per Floor—
04 — Lighting & AV
💡
Lighting Fixtures
—/floor
Workstation Zone (39%)—
Meeting Rooms (11%)—
Collab / Informal (8%)—
Café / Lounge (6.5%)—
Circulation / Common (16%)—
Washrooms / Services (9.7%)—
Reception / Lobby (3.2%)—
Total Fixtures · Per Floor—
📺
AV Equipment
Total AV Units—
05 — Indicative Area Zoning
🗺️
Zone Area Allocation
—
Standards Applied
NBC India 2016 — Washroom norms
ISHRAE — HVAC load factors by climate zone
BIS SP:41 — Lighting (350–500 lux office)
IWPS Global Space Benchmarks v3.0
Room Configuration
Standard rooms use the IWPS 3.67:1 ratio to auto-calculate quantities. Fixed-count rooms (training rooms, work cafés, multipurpose halls) are set by the designer based on client brief and are not ratio-driven.
Disclaimer
Indicative space programming for preliminary planning. Final numbers subject to detailed brief, local authority approvals, and architectural design.